data center planning

Results 1 - 25 of 35Sort Results By: Published Date | Title | Company Name
Published By: Digital Realty     Published Date: Feb 25, 2015
When measuring competitive differentiation in milliseconds, connectivity is a key component for any financial services company’s data center strategy. In planning the move of its primary data center, a large international futures and commodities trading company needed to find a provider that could deliver the high capacity connectivity it required.
Tags : 
financial services, trade processing, data center, connectivity, data center, it management, data management, infrastructure
    
Digital Realty
Published By: Riverbed     Published Date: Jul 17, 2013
How to effectively troubleshoot your VDI deployment Virtual desktop infrastructure has come a long way since the first steps were taken a decade ago to run desktop workloads in the data center. While more pervasive today, VDI technologies are latency-sensitive, and wholly dependent on the network. Complaints of poor end-user experience persist, especially over the WAN at branch offices where bandwidth constraints and latency delays are common. But there is a way to ensure consistent and reliable VDI performance to deliver: Reduced downtime Faster troubleshooting Improved SLAs Enhanced planning and control Read this brief to learn how the Riverbed® Cascade® application-aware network performance management (NPM) solution unlocks VDI visibility.
Tags : 
virtual desktop, infrastructure, deployments, cascade, riverbed, local area networking, network architecture, network management
    
Riverbed
Published By: Schneider Electric     Published Date: Oct 17, 2016
This paper demonstrates, through a series of examples, how data center infrastructure management (DCIM) software tools can simplify operational processes, cut costs, and speed up information delivery.
Tags : 
    
Schneider Electric
Published By: Schneider Electric     Published Date: Oct 17, 2016
Questo documento vuole dimostrare, attraverso una serie di esempi, in che modo gli strumenti software di gestione dell'infrastruttura del Data Center possono semplificare i processi operativi, ridurre i costi e rendere più rapida la comunicazione delle informazioni.
Tags : 
    
Schneider Electric
Published By: Schneider Electric     Published Date: Oct 17, 2016
This paper outlines practical steps that include clear methodologies, at-a-glance calculators and tools, and a comprehensive library of reference designs to simplify and shorten your planning process while improving the quality of the plan.
Tags : 
    
Schneider Electric
Published By: IBM     Published Date: May 02, 2013
The explosion in IT demand has intensified pressure on data center resources, making it difficult to respond to business needs, especially while budgets remain flat. As capacity demands become increasingly unpredictable, calculating the future needs of the data center becomes ever more difficult. The challenge is to build a data center that will be functional, highly efficient and cost-effective to operate over its 10-to-20-year lifespan. Facilities that succeed are focusing on optimization, flexibility and planning—infusing agility through a modular data center design.
Tags : 
modular, data center, efficient, optimization, flexibility, cost-effective
    
IBM
Published By: Schneider Electric     Published Date: Feb 17, 2017
This paper demonstrates, through a series of examples, how data center infrastructure management (DCIM) software tools can simplify operational processes, cut costs, and speed up information delivery.
Tags : 
dcim, costs, operational processes, data centers
    
Schneider Electric
Published By: Aberdeen Group     Published Date: Jun 03, 2011
This report is a detailed examination of how backup and recovery practices vary by the size of the enterprise.
Tags : 
aberdeen, disaster recovery, datacenter uptime, business continuity, business interruptions, disaster planning, cloud storage, storage as a service
    
Aberdeen Group
Published By: Riverbed     Published Date: May 18, 2012
Data center consolidation and migration projects are fraught with risk. By using Network Behavior Analysis (NBA) systems to get a handle on dependency information, usage information, change impact information, and post-change problem identification, IT organizations can significantly reduce risk by automating and improving the planning process and minimizing disruption during implementation. Download this informative Riverbed white paper to learn more.
Tags : 
data center consolidation, migration, it infrastructure, network behavior analysis, nba analysis, it management, knowledge management, platforms
    
Riverbed
Published By: Citrix NetScaler     Published Date: May 06, 2013
The ability to observe, diagnose, and subsequently improve the performance of business-critical applications is essential to ensuring a positive user experience and maintaining the highest levels of employee productivity and customer satisfaction. The challenge of establishing an effective application visibility and control function is only growing, as trends such as mobility, virtualization, and cloud computing fundamentally alter datacenter and application architectures. With NetScaler Insight Center enterprises get: • Unparalleled application visibility and invaluable operational intelligence; • Increased operational efficiency, as troubleshooting and capacity planning efforts are greatly simplified; • An optimized user experience that drives greater employee productivity and customer satisfaction; • Increased assurance that governing SLAs will always be met; and, • Reduced total cost of ownership, based on having a low-cost, low-impact solution—particularly compared to traditional
Tags : 
application visibility, netscaler insight center, optimized user experience, low cost, citrix, knowledge management, enterprise applications
    
Citrix NetScaler
Published By: Raritan Inc.     Published Date: Mar 19, 2009
Learn what instrumentation helps calculate your data center power efficiency and how to set standards to align with the Green Grid.
Tags : 
raritan, power, processing, instrumentation, green, green computing, efficiency, power load
    
Raritan Inc.
Published By: Raritan Inc.     Published Date: Feb 23, 2009
This white paper explores the challenges of increasing computing power in resource-constrained physical spaces and data centers experiencing high growth. We also explore how intelligent rack PDUs can meet these challenges and address critical uptime and capacity planning issues.
Tags : 
raritan, power, processing, instrumentation, green, green computing, efficiency, power load
    
Raritan Inc.
Published By: HP Data Center     Published Date: Mar 25, 2009
When considering server virtualization, planning and design are critical.  How do you optimize your environment through virtualization?  How do you keep your server sprawl from becoming virtual server sprawl?  How will a virtualized environment help your business?  Will your existing data center meet current, and future, business requirements? Answer your Questions today!
Tags : 
hp data center, virtualization, server planning, server design, server sprawl, tco, roi, server consolidation
    
HP Data Center
Published By: HP Data Center     Published Date: Mar 25, 2009
When Alcatel bought out Lucent at the end of 2006, the two companies had already begun planning data center consolidations of their own, but the merger changed all that. As it turns out, the merged company created a plan to consolidate 25 data centers and 125 server rooms down to six data centers and just a few server rooms. This change has presented challenges, especially in terms of arranging downtime and dealing with employees' attachment to their servers and applications, but the company is on pace to meet it’s goal of reducing IT operational cost by 25% over three years.
Tags : 
alcatel-lucent, hp data center, it infrastructure, data center transformation, merger, downtime, server application, change management
    
HP Data Center
Published By: Compass Datacenters     Published Date: Jul 07, 2015
A high percentage of today’s data centers use water-based cooling methods. Although evaporative cooling, whether through traditional towers or “advanced” adiabatic cooling systems (aka swamp coolers), remain highly effective cooling methods, when you’re planning a new data center you may want to consider the impact of the weather and water availability on your decision.
Tags : 
echnology, water, evaporative cooling, swamp coolers, data center maintenance, it management, disaster recovery
    
Compass Datacenters
Published By: EMC Corporation     Published Date: Dec 01, 2014
The Solution Guide provides an introduction to data protection through continuous availability. The guide enables you to begin the planning and design of continuous availability for a Federation Software-Defined Center solution.
Tags : 
software-defined data center, data protection, planning and design, continuous availability, data center
    
EMC Corporation
Published By: IBM     Published Date: May 04, 2009
Even with increased start-up costs, higher-end processors can offer a lower TCO thanks to better performance. This white paper shows detailed comparisons between higher- and lower-end servers with surprising results—including a 42% lower TCO and 87% faster performance for the higher-end processor.
Tags : 
ibm, express seller, virtualization intel, xeon, processor, 5500, bladecenter, system x
    
IBM
Published By: HP     Published Date: Mar 31, 2015
When was the last time you thought about your disaster recovery plan? Natural disasters, such as earthquakes, tsunamis, hurricanes, fires, or floods can occur anytime and disable your data center, with little to no warning. Hacker activities like a denial of service attack can also take down your systems unexpectedly. Then you have the more mundane risks such as human error and hardware or software failures. The only predictable thing to say about these risks is that at some point, on some scale, you’ll have to recover your data center from downtime. When it comes to disaster readiness, proactive planning is the key to success. Every business, regardless of size, needs to have a well-tested disaster recovery plan in place. Every minute your systems are down, the financial implications grow. Take the assessment to see where your disaster recovery plan ranks. Then learn about next steps and more information.
Tags : 
disaster recovery, natural disasters, data center, hackers, hardware failure, software failure, planning, disaster readiness
    
HP
Published By: HP     Published Date: Mar 31, 2015
No business is immune to the threat of IT downtime caused by natural and manmade disasters. Natural disasters—such as earthquakes, tsunamis, hurricanes, fires, and floods—can happen with little to no advanced warning. But the bigger risk is often human-induced events—from simple IT configuration errors to significant data center problems. If you lack a rock-solid disaster recovery (DR) plan, any of these unpredictable events—natural or manmade—could bring your business and its revenue streams to a halt. Yet many organizations are not well prepared for the unknown. The randomness of such events lulls people into a sense of false security—“That’s not likely to happen here.” While you can hope to avoid events that threaten the continuity of your business, the reality remains unchanged: Disasters happen—so you need to prepare for them. Are you prepared? Please download this eBook to find out!
Tags : 
disaster recovery, natural disasters, data center, hackers, hardware failure, software failure, planning, disaster readiness
    
HP
Published By: NetShelter - CyrusOne     Published Date: Oct 12, 2011
This whitepaper outlines issues that arise when planning for growth of IT infrastructure and explains how the colocation of data centers can provide scalability, enabling users to modify capacity quickly to meet fluctuating demand.
Tags : 
cyrus one, data center, texas, infrastructure, capacity, planning, colocation, scablability
    
NetShelter - CyrusOne
Published By: Schneider Electric     Published Date: Jun 04, 2014
Business executives are challenging their IT staffs to convert data centers from cost centers into producers of business value. Data centers can make a significant impact to the bottom line by enabling the business to respond more quickly to market demands. This paper demonstrates, through a series of examples, how data center infrastructure management software tools can simplify operational processes, cut costs, and speed up information delivery.
Tags : 
schneider, electric, data, infrastructure, convert data, business value, it management, data management
    
Schneider Electric
Published By: CyrusOne     Published Date: Jan 19, 2012
If your data center is running out of space or power you have 2 options. You can build and operate a new facility, or you can lease the capacity.
Tags : 
colocation, cloud, infrastructure, data centers, data center planning, cyrusone, cyrus one, data center
    
CyrusOne
Published By: CyrusOne     Published Date: Jan 19, 2012
Today's enterprises increasingly occupy the cloud. As in nature, the IT cloud needs a sky in which to live. That environment is colocation-read more!
Tags : 
colocation, cloud, infrastructure, data centers, data center planning, cyrusone, cyrus one, data center
    
CyrusOne
Published By: CyrusOne     Published Date: Jan 19, 2012
This paper explores issues that arise when planning for growth of Information Technology infrastructure and explains how colocation of data centers can provide scalability, enabling users to modify capacity quickly to meet fluctuating demand.
Tags : 
colocation, cloud, infrastructure, data centers, data center planning, cyrusone, cyrus one, data center
    
CyrusOne
Published By: IBM     Published Date: Oct 10, 2013
A though leadership white paper discusses how virtualization, cloud computing, and the proliferation of smart devices are helping companies meet their goals and be more effective with their IT investments but are placing increased demands on the datacenter network. Organizations can no longer afford to treat the datacenter network as an afterthought, and it is not sufficient to simply throw more ports or bandwidth at the problem. IBM offers a portfolio of datacenter network planning, integration, and management services designed to maximize customers' DCN success. By working with customers to plan and implement the appropriate network design at the beginning of an IT project, IBM can help customers meet their business requirements, minimize operating costs, and build in flexibility for the future.
Tags : 
leveraging networks, virtualization, cloud intiatives, networking, cloud computing, datacenter, it investments, minimize operating costs
    
IBM
Previous   1 2    Next    
Search Research Library      

Add Research

Get your company's research in the hands of targeted business professionals.